This project delivered Boroondara City Council with a well-integrated stormwater harvesting and treatment solution at two sites. Both sites were located in high profile and high value public open s...
E2Designlab are part of a team investigating options for integrated water management and WSUD at Sydney Science Park close to the new airport at Badgery's Creek. Integrated WSUD approaches are prop...
The project harvests stormwater from Elster Creek with treatment in a sediment basin and wetland located within Elsternwick Golf Course. Treated water is stored in Elsternwick Park Lake and harvest...
The Royal Park stormwater harvesting project is one of Melbourne's most successful and well established stormwater harvesting projects, filtering urban runoff to supply irrigation water for the Cit...
Bellvista Estate is a vibrant residential community located on the flat coastal plain of the Sunshine Coast, adjacent to Lamerough Creek which discharges to Pumicestone Passage, a RAMSAR liste...
The Toolern Integrated Urban Water Management Strategy supports the Toolern Precinct Structure Plan and provides direction for Western Water’s infrastructure planning and policy’s. Und...
Clear Paddock Creek is within the Georges River Catchment in south-western Sydney. Under a catchment-wide vision, the project removed 2.5km of concrete-lined stormwater channel and reinstated the n...
Slacks Creek encompasses some of the oldest settled areas in Logan and has been highly modified by past urbanisation. Its location in the heart of the City presents an opportunity to convert this a...
Water bodies provide many environmental, social and economic benefits however in urban catchments maintaining ecological and social functions can be a challenging and costly exercise for local gove...
The Bundamba Creek Corridor flows through rural, industrial and established urban suburbs and provides multiple functions including cultural and recreational connections, vegetation and habitat, wa...
E2Designlab assisted Geelong City Council to assess their wetland and waterbody assets and develop maintenance plans and procedures to inform future works on these assets. A benchmark condition an...
E2Designlab conducted two investigations for Werribee Zoo, a review of waterbody performance and management of the Hippo exhibit water system. These projects built on our previous experience workin...