E2DESIGNLAB
  • Home
  • About
  • Services
  • Projects
  • Team
  • Partners
  • Blog
  • Contact
  • Twitter
  • Linked In
  • Email
St Gregorys
Water Sensitive Urban Design
WSUD for Schools

St Gregory’s College Water Sensitive Urban Design

St Gregory’s College, Sydney

E2Designlab developed an integrated water management strategy for St Gregory’s College in south western Sydney, identifying issues and opportunities for cost savings and reduced impact on the environment.   A water balance was prepared to quantify the various urban water streams providing important information for improved water management and for design of water management infrastructure.

A concept design and development application were prepared for a stormwater harvesting scheme that provided water suitable for irrigation of playing fields.  The wetlands and pond are integrated with a retarding basin (on-site detention) to mitigate potential flooding impacts downstream of the site.

Detailed design and construction drawings prepared focussed on providing for future opportunities to extend the scheme, optimising treatment performance and integrating greater operational flexibility for water storage and irrigation.

The wetlands and harvesting infrastructure will be constructed in 2016.

Water Sensitive City Outcomes

  • alternative water supply
  • stormwater quality improvement
  • enhanced amenity values

Permeable Paving Testing

Infiltration Testing for Permeable Pavement Systems

Stormwater Harvesting for Open Space Irrigation

Royal Park Wetland and Stormwater Harvesting System

Large Scale Alternative Water Supplies

Toolern Integrated Water Cycle Management Strategy Designs

Stormwater Harvesting

Elsternwick Park Stormwater Harvesting

Asset Maintenance

Streetscape WSUD Asset Auditing, Maintenance and Rectification

Integrated Community Water Planning

Sydney Science Park Integrated Water Design

WSUD for Residential Developments

Harcrest Residential Development

Retrofit Solutions

Allgas Street Stormwater Disconnection and Riparian Rehabilitation

Priority Stormwater Treatment and Harvesting Design

Priority WSUD Projects: Gordon Barnard Reserve and Macleay Park

Stormwater Treatment Design

Bellvista Estate Streetscape WSUD

Linked Harvesting Networks

Eltham Corridor Stormwater Harvesting Network

WSUD for New Development

Sunbury Hills WSUD Strategy

WSUD for Public Realm

Western Precinct Raingarden and Wetland Design

Flood Mitigation

Elizabeth Street Catchment Flood Risk Reduction Study